PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1st course of block at Corridor 175B Facing West.jpg Continued installing gravel at the 1st Floor Boiler-Electrical Room Facing West.jpg Installed one course of block at the 1st floor Attorneys Room Facing East.jpg 3rd floor sprinkler branches-heads Facing West.jpg 3rd floor Sprinkler raiser Facing North-West.jpg Continued laying out block along the South Elevation rooms Facing East.jpg
Previous pageNext page Continued installing gravel at the 1st Floor Boiler-Electrical Room Facing West
Continued installing gravel at the 1st Floor Boiler-Electrical Room Facing West